Skinners’ Hall, London
Category: Commercial Scaffolding
The Skinners Hall renovation is a multi-million-pound overhaul of this Grade I Listed building and Scheduled Ancient Monument protected by Historic England legislation.
- Project Length – 70 Weeks
- Project Value – £850k
Key Deliverables:
1380m2 Plan of HAKI System 750 AL Roofs
Foundation and support scaffolds below roofs covering 8500m3, weighing approximately 250 Tonnes
2000m2 of timber decking, based on 3700m of scaffolding lifts
28,000m of scaffolding tubes
30,000 Scaffolding Couplers
1500m of Aluminium Beams
We care about your opinion
Inner City were excellent at understanding the project constraints and surrounding risks when designing their scaffolds. This took into account the environment, consents required and the use of existing infrastructure. This is extremely important in a railway environment where the safety of the operation railway in of paramount importance.
Volker Fitzpatrick
Just a quick note to express how impressed I have been with Inner cities attitude towards our Harrow Road project, throughout this project you have become a most reliable ally. It’s very reassuring knowing that I can fully rely on a contractor to adapt to our sites ever changing needs and you have performed impeccably.
The Brennan Group
Using Inner City for our home renovation. Very professional, gave us really valuable advice on how the scaffolding should be set out based on the extensive work we are carrying out. Wouldn’t hesitate to recommend them.
Residential Customer
As a demolition contractor we rely on a reliable professional scaffolding contractors. Inner City deliver innovative cost effective solutions for a range of protection demolition scaffolding.
Downwell Demolition
I highly recommend ICS as they are reliable, accurate and very experienced in a railway environment, they will remain at the top of our supply chain list for future works on the project.