Wapping Chimney
Category: Demolition Scaffolding
Scope of works:
Erection of independent scaffolding to protect a Grade II listed building to the rear of 50m high chimney
This work was for one of our long-standing demolition clients.
The chimney had to be hand demolished because of the building behind being less than a metre away.
The scaffolding bridged over the building from the rear and the chimney scaffolding erected from there.
Fire retardant monarflex to full height encapsulated the scaffolding with additional protection netting covering the building.
The hand demolition work progress resulted in Inner City striking a ring every other day.
We care about your opinion
Inner City were excellent at understanding the project constraints and surrounding risks when designing their scaffolds. This took into account the environment, consents required and the use of existing infrastructure. This is extremely important in a railway environment where the safety of the operation railway in of paramount importance.
Volker Fitzpatrick
Just a quick note to express how impressed I have been with Inner cities attitude towards our Harrow Road project, throughout this project you have become a most reliable ally. It’s very reassuring knowing that I can fully rely on a contractor to adapt to our sites ever changing needs and you have performed impeccably.
The Brennan Group
Using Inner City for our home renovation. Very professional, gave us really valuable advice on how the scaffolding should be set out based on the extensive work we are carrying out. Wouldn’t hesitate to recommend them.
Residential Customer
As a demolition contractor we rely on a reliable professional scaffolding contractors. Inner City deliver innovative cost effective solutions for a range of protection demolition scaffolding.
Downwell Demolition
I highly recommend ICS as they are reliable, accurate and very experienced in a railway environment, they will remain at the top of our supply chain list for future works on the project.