Harrow Road

Harrow Road

Harrow Road

Category: Demolition

Scope of works: A free-standing heavy-duty loading gantry 10kn pms to support cabins and protect pedestrians on the footpath below. Plus independent scaffolding at 2 0 meters high to front, side and back.

The independent scaffolding enabled the brickwork contractors to build up walls to the concrete frame.

A beamed section was used on the other side spanning the party wall to allow the supply of materials to the bricklayers.