Scope of works:

A construction project to build two thirty-five apartment blocks.

The requirement was for two fully boarded independent scaffolds at floor level lifts with branded fire retardant wrapping.

Block A was under a meter away from a neighbouring building which meant that Inner City was required to build a beamed horse scaffold.

The scaffolding came out of the building to support a cantilever scaffold.

It measured 20 meters in length, taking up additional 6 meters for external brickwork.

Both blocks required staggered level heavy duty beamed loading bays to allow crane loading to every level.

Additionally, to this, we were required to adapt both scaffolds to incorporate intermediate rope uplifts for the bricklayers.

A hoist tower runoff on Block A to provide loading for the goods hoist erected.