Scope of works:

A construction project requiring independent scaffolding with gable end hop ups for the new shell and roof with access stairs.

Working at this prestigious School for our established client the scope of works grew as the works progressed.

Hakki staircases were used for the access stairs. Heavy duty loading bays were installed at each level for crane loading.

Interior scaffolding included several birdcages for the installation of steels and joists on the ground and second floors of each block.

Access to offices and welfare units was added to our works.