Scope of works:

To design and erect a temporary bridge beamed scaffold to support the diverted services and a 10Kn crash deck to the underside of slab over the Christmas period.

Over the first a 12 hour possession a scaffold deck was erected beneath the bridge, spanning the entire underside before the demolition works commenced.

The crash deck was erected to catch debris demolished from above and also act as fall prevention.