Name: Harbour Exchange
Location: London
Sector: Infrastructure
Value: £100,000
Scope
Inner City Scaffolding was appointed to design and install a bespoke access solution for façade works and flue extension at Harbour Exchange. The project involved erecting a 36m high scaffold with a heavy-duty loading gantry and a 300kg lifting frame, while maintaining a critical clearance between the scaffold and the building to accommodate the full-height flue installation.
Our team led the initial design phase, ensuring all steelwork supports were integrated ahead of the flue extension works.
Key Deliverables
- Access Scaffold: 36m high scaffold structure for external façade access
- Heavy-Duty Gantry: Engineered loading gantry to support materials and equipment
- Lifting Frame: 300kg lifting frame installed for vertical material handling
- Design Integration: Scaffold designed with clearance for flue extension and adapted to support steelworks
Outcome
Harbour Exchange showcases Inner City Scaffolding’s ability to deliver precision-engineered access solutions in commercial environments. The scaffold remains fully operational, with all structural adaptations completed in preparation for the next phase of flue installation.