Name: Harbour Exchange

Location: London

Sector: Infrastructure

Value: £100,000

Scope

Inner City Scaffolding was appointed to design and install a bespoke access solution for façade works and flue extension at Harbour Exchange. The project involved erecting a 36m high scaffold with a heavy-duty loading gantry and a 300kg lifting frame, while maintaining a critical clearance between the scaffold and the building to accommodate the full-height flue installation.

Our team led the initial design phase, ensuring all steelwork supports were integrated ahead of the flue extension works.

Key Deliverables

  • Access Scaffold: 36m high scaffold structure for external façade access
  • Heavy-Duty Gantry: Engineered loading gantry to support materials and equipment
  • Lifting Frame: 300kg lifting frame installed for vertical material handling
  • Design Integration: Scaffold designed with clearance for flue extension and adapted to support steelworks

Outcome

Harbour Exchange showcases Inner City Scaffolding’s ability to deliver precision-engineered access solutions in commercial environments. The scaffold remains fully operational, with all structural adaptations completed in preparation for the next phase of flue installation.