Name: Bow Exchange
Location: London
Sector: Residential
Value: £400,000
Scope
Inner City Scaffolding was appointed to deliver a full scaffold design and installation package for Bow Exchange – a new build development comprising apartments and social housing for a long-standing client. The project required independent scaffolding to the full height of the 11-storey building, alongside a large loading gantry positioned adjacent to the pit lane.
To support site logistics, staggered loading bays were installed at each floor level for crane loading, and one elevation required a bespoke scaffold design to bridge over multiple party walls. The main scaffold was clad in green flame-retardant debris netting to align with the main contractor’s branding.
Key Deliverables
- Full Scaffold Design
- Independent Scaffold: Floor-level lift scaffold to all 11 storeys
- Loading Infrastructure: Large loading gantry; and Staggered loading bays at each floor level
- Structural Adaptations: Bridge beams over party walls
- Brand Integration: Green flame-retardant debris netting to match contractor colours
Outcome
Bow Exchange demonstrates Inner City Scaffolding’s ability to deliver high-rise scaffold solutions tailored to both logistical and aesthetic requirements. Our engineered approach ensured safe access, efficient material movement, and seamless integration with site operations over the 50-week programme.

