Name: Beresford Street
Location: Rochester, Kent
Sector: Residential
Value: £400,000
Scope
Inner City Scaffolding was appointed to deliver a full perimeter access solution for a 12-storey structure at Beresford Street, supporting façade works and multi-trade operations across the building envelope.
The scope included the installation of perimeter scaffolding to all elevations, construction of a hoist run-off to enable seamless vertical transportation, and erection of strategically positioned loading bays to optimise workflow and reduce congestion. Perimeter fans were also installed to mitigate risks and maintain safety for operatives and the public at height.
Thanks to proactive planning and expert execution by our site team, the scaffolding works were delivered to programme while upholding the highest safety standards. The access solution continues to play a critical role in supporting the next phase of construction.
Key Deliverables
- Full Façade Access: Perimeter scaffolding to all 12 storeys
- Vertical Logistics: Hoist run-off construction for efficient material and operative movement
- Workflow Optimisation: Strategically placed loading bays to reduce congestion
- Safety Measures: Installation of perimeter fans for public and operative protection
Outcome
This project highlights Inner City Scaffolding’s ability to deliver large-scale, multi-functional access solutions in complex urban environments. Through strategic planning, safety-first execution, and logistical coordination, ICS enabled uninterrupted progress on a 50-week programme supporting critical rail infrastructure development.

