Lion Green Road
Category: Commercial Scaffolding
Lion Green Road is for a long-standing client and consist of the construction of five new build blocks of apartments. Our task was to erected floor level lifts with a mix of staggered and cantilevered loading bays for crane loading. Next stage of the scheme was to adapt all elevation for progressive brickwork then to reinstate the scaffolding back to floor level lifts. The scaffolding was also fully clad in fire retardant green debris netting to match the client’s colors.
- Project Length – 60 weeks
- Full Design
- Project Value – £350k
We care about your opinion
Inner City were excellent at understanding the project constraints and surrounding risks when designing their scaffolds. This took into account the environment, consents required and the use of existing infrastructure. This is extremely important in a railway environment where the safety of the operation railway in of paramount importance.
Volker Fitzpatrick
Just a quick note to express how impressed I have been with Inner cities attitude towards our Harrow Road project, throughout this project you have become a most reliable ally. It’s very reassuring knowing that I can fully rely on a contractor to adapt to our sites ever changing needs and you have performed impeccably.
The Brennan Group
Using Inner City for our home renovation. Very professional, gave us really valuable advice on how the scaffolding should be set out based on the extensive work we are carrying out. Wouldn’t hesitate to recommend them.
Residential Customer
As a demolition contractor we rely on a reliable professional scaffolding contractors. Inner City deliver innovative cost effective solutions for a range of protection demolition scaffolding.
Downwell Demolition
I highly recommend ICS as they are reliable, accurate and very experienced in a railway environment, they will remain at the top of our supply chain list for future works on the project.