Contact

Blog

Inner City on track at Ilford Station over Christmas

Scaffolding Project at Ilford Station

During the lead-in period to Christmas Inner City Scaffolding and our sister company Downwell Demolition were busy. We completed the installation of a complex internal bespoke ladder beamed scaffold frame at Ilford Station for Volker Fitzpatrick.

Our scaffolding works involved cantilever beams splayed out through the windows. This allowed us to build external edge protection for the 2nd phase Christmas Day blockade works.

The key focus was ensuring maximum amount of pedestrian walkways and head heights. This allowed the station to remain fully operational.

On Christmas Day we returned to complete the 2nd phase external works.

These works included cutting holes in the roof and erecting  full protection scaffolding to the external elevations above the footbridge.

We developed a cutting edge weatherproofing system to ensure that there is no water ingress between Christmas and the planned late January demolition date.

These works were completed safely, with no accidents or incidents and well ahead of the allotted programme allowance.

Downwell demolition will start in late January for the demolition of the station building.

Inner City provide a full range of  services in London and the South East.

 

  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
go to top