We were appointed to erect protection scaffolding around Cromlech House on Middlesex St so that it can safely be demolished. The project has been divided up into 2 phases with phase 2 coming later. The scaffolding was required on both the east and west elevations of the building to provide protection to the pedestrians and traffic moving down Middlesex St & Goulston St.

Scope of Works

  • Erect 5500m2 of scaffolding to provide protection so the 4 storey concrete framed structure can be demolished.
  • 60m protection fan added to the Middlesex St elevation so that the pedestrians can safely move by the site
  • Encapsulate scaffold with flame retardant Monarflex

Project Name:
Middlesex St (Phase 1)

Location:
Middlesex St, London, E1 7TP

Client:
Tolent Construction

Project Dates:
April 2016 - August 2016

Project Value:
£175,000

  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer

CONTACT US TODAY TO DISCUSS HOW WE CAN ASSIST YOUR REQUIREMENTS

Contact

Please select the division you wish to connect with:

Please leave this field empty.

Newsletter